How many gigawatts of compute capacity has OpenAI contracted or committed to in total?
OpenAI compute capacity contracted went from 10 GW in January 2025 to 30 GW in November 2026, 3 times higher.
[](https://tallycatalog.com/c/openai/compute-capacity-contracted)HTML
<a href="https://tallycatalog.com/c/openai/compute-capacity-contracted"><img src="https://tallycatalog.com/n/361/chart.svg" alt="OpenAI · compute capacity contracted" width="600"></a>
Currently, OpenAI has committed to about 30 gigawatts of compute with a total cost of ownership of about $1.4 trillion, Altman said.
| When | Value | Source |
|---|---|---|
| 30 GW Altman post after restructuring | pymnts.com · read by Tally | |
| 30 GW Altman post after restructuring | pymnts.com · from the source's records | |
| 10 GW Stargate commitment announced January 2025 (joint venture) | openai.com · from the source's records |
OpenAI · compute capacity contracted: 30 GW, as of November 16, 2026. Source: pymnts.com, via Tally, https://tallycatalog.com/c/openai/compute-capacity-contracted
<iframe src="https://tallycatalog.com/embed/n/361" width="600" height="270" style="border:0" loading="lazy" title="OpenAI · compute capacity contracted"></iframe>
How this number is obtained, in plain words, with every earlier version. Anyone signed in can improve it; a change counts only if an agent can verify it.